The Other Ones Foundation periodically seeks proposals and bids for goods and non-consumer services through a Request for Proposals (RFP) process and Request for Bids (RFB) process. Below is a list of available opportunities.
RFPs:
RFBs:
July 25, 2022
To: Undisclosed bidders
RE: Esperanza Community Development
Request for Bids: Construction of Shower and Toilet Structures
Dear Bidder,
Your firm is invited to submit a Bid for the following open-shop scope of work.
If you are interested in bidding, please confirm via reply email. If you cannot provide a price, please let me know by return email. A written scope of work follows. Structural and Architectural Drawings are attached.
Walk-through: Monday, August 8, 2022, 10:00am at 780 South Highway 183
Proposal due: August 15, 2022, via email (m.emert@toofound.org)
Scope of Work:
Furnish and install all material, labor and equipment to construct the first four (4) of (8) Shower Toilet Structures as per the plans and specifications listed below, with exceptions to the Foundations, Plumbing and Electrical work, as follows:
Foundations: The foundation work has been completed and is not part of this scope of work.
Plumbing: The under-slab plumbing work has been completed and is not part of this scope of work.
The work of this contract includes:
Furnish and Install the above grade Plumbing work for the first four of eight (8) Shower / Toilet structures, including, but not limited to:
- Furnish and install all branch piping for water, wastewater and vent lines including all insulation.
- Furnish and install the lav’s, WC’s, Showers, Fixtures, Toilet Accessories, and On-Demand Water Heaters.
Electrical: The power for each Shower Toilet Structure has been completed and is not part of this scope of work.
The work of this contract includes: Furnish and Install the above grade Electrical work for the first four of eight (8) Shower / Toilet structures, including, but not limited to:
- Furnish and install all panels, junction boxes, branch wiring, light fixtures and devices for convenience outlets and lighting.
- Wiring of the On Demand Water Heaters is to be completed by the contractor.
Aside from the above referenced modifications, the work of this contract includes, but is not limited to:
Scope of Work: Phase One Shower/Toilet Structures (The first 4 of 8 Structures)
Furnish and install all labor, material, equipment, supervision, and coordination required to construct the first four of eight (8) Shower / Toilet structures, according to the plans and specifications hereinafter referred, more particularly described on the following architectural and structural drawings along with renderings and RFI #15 Responses:
- ESPERANZA - A1 BATHS - Updated Floor Plans - 10 -7 -21
- Esperanza Community Restrooms - STR 11.29.21
- Esperanza RR Building MEP 04.29.22
- TOOF ESPERANZA - BATHS 4BANK w ADA CMU-L-ANG DIVs MTL ROOF - 5-15-21
- TOOF ESPERANZA - BATHS 4BANK XRAY CMU-L-ANG-DIVs MTL ROOF - 5-15-21
- ESPERANZA - 0SP1 - UPDATED SITE PLAN - 4-6-22
- RFI #15 dated 03.22.22 revised 06.30.22
Provide fully developed and coordinated shop drawings and/or catalog cuts for Owner review and approval for all electrical, plumbing, masonry and steel structural work.
The layout of building corners will be provided to this contractor by others. Elevations from existing benchmarks and any interior layout will be the responsibility of this contractor.
July 25, 2022
To: Undisclosed bidders
RE: Esperanza Community Development: Receive & Erect Two (2) Aztec Model Q50-19 Quonset Huts
Dear Bidder,
Your firm is invited to submit a Bid for the following open-shop scope of work.
If you are interested in bidding, please confirm via reply email. If you cannot provide a price, please let me know by return email. A written scope of work follows. Structural and Architectural Drawings are attached.
Proposal due: Monday, August 23, 2022, via email (m.emert@toofound.org)
Walk-through: by appointment at 780 South Highway 183
Scope of Work:
Erect and install all material, equipment, labor, supervision, and coordination required to install, in a good and workmanlike manner, and according to the plans and specifications hereinafter referred, the first two of four Aztec Model Q50-19 Quonset Huts to be located in the first two (2) of four (4) Gathering Areas for Owner upon 780 South Highway 183, more particularly described on the following architectural and structural drawings along with renderings:
Aztec Sheet 1 of 5
Aztec Sheet 2 of 5
Aztec Sheet 3 of 5
Aztec Sheet 4 of 5
Aztec Sheet 5 of 5
Erection Guide – Quonset Hut
2022-04-05 Esperanza Gathering Space – STR
The Other Ones Foundation Quonset Hut 220414 - Rendering
The Contractor shall plan, supervise, and direct the project, using the Contractor's best skill and attention. The Contractor shall have sole responsibility and authority to deal with any and all subcontractors and suppliers. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the project under the contract, unless contract documents give other specific instructions concerning these matters.
The layout of building corners will be provided to this contractor by others. The foundation work is in place. Elevations from existing benchmarks and any interior layout will be the responsibility of this contractor.